/

Prototype Development Roadmap

Timeline: June – November 2025

Barbary Coast Marine is building a next-generation shipboard compliance system integrating Integral Mind’s AI platform, OpenVDM, and maritime communication protocols (NMEA 2000 and SeaTalk). This roadmap outlines our milestones leading up to a real-world test aboard a large cargo vessel on October 12–13, 2025.

---

June 2025 — System Integration Planning

  • Finalize architecture combining AI, OpenVDM, and marine protocols.
  • Specify camera systems and sensor inputs for ingestion pipeline.
  • Design AI training plan based on Coast Guard compliance rules.
  • Procure onboard server and networking hardware.
---

July 2025 — Core System Assembly

  • Develop AI ingestion from camera and sensor feeds.
  • Build connectors for NMEA 2000 and SeaTalk networks.
  • Begin training compliance model on regulatory data sets.
  • Configure lab-based development server for full-stack testing.
---

August 2025 — Onboard Setup & Training

  • Install server on test vessel; upgrade network infrastructure.
  • Connect real-time inputs to OpenVDM and test data flow.
  • Verify AI alerts and feedback against regulatory logic.
  • Train crew on system use and interface navigation.
---

September 2025 — Pre-Test Validation

  • Perform dockside simulation of system performance.
  • Trigger artificial compliance violations to test AI alerts.
  • Incorporate expert feedback into system refinements.
  • Finalize auto-reporting and data archival structure.
---

October 12–13, 2025 — Live At-Sea Test

  • Conduct full underway field test aboard cargo vessel.
  • Record live sensor and camera data with AI analysis.
  • Validate real-time compliance reporting and logging.
  • Gather crew feedback on functionality and usability.
---

November 2025 — Post-Test Iteration & Scale-Up

  • Analyze performance data and system logs.
  • Optimize model and infrastructure for deployment.
  • Define roadmap for pilot expansion to additional vessels.
  • Deliver partner and investor updates post-successful test.
×